After making all the decisions on design and specification of the required greenhouse equipment as well as the approval of the general construction plan, we proceed to the engineering of the greenhouse. During the design process we provide you with all the necessary drawings and technical documents for obtaining the building permit as well as for the commissioning of the greenhouse project. The design is divided into 3 main parts.
A. The first part is engineering of a greenhouse. This work is carried out in our head office in the Netherlands. Therefore the greenhouse constructed by Agro Invest Holland is truly Dutch! At this stage all the systems of the greenhouse are developed in detail. The result of this work is the so-called Dutch draft design.
B. The second part of the design is the stage P. It is processing of the Dutch draft design in the Russian project design. At this stage all the external networks are engineered. Communication and other infrastructural elements on the site which are not a part of the greenhouse are designed, such as warehouses, roads etcetera. On the basis of the completed project, the customer can obtain the building permit in the relevant bodies. The project at stage P is frequently the main condition for obtaining a credit line at the bank.
C. The third part is the development of a full set of as-built drawings and project documentation on the basis of which the construction of the greenhouse is carried out. This stage is usually completed before the construction work can start.